Beach Hut Frinton

Beach Hut Frinton

Frinton Beach Hut     Franks Halls and Son Ltd were contacted by an owner of a beach hut in frinton which need reapiring.  The team repaired the wood before applying an undercoat and top coat of paint  before – hole in roof 2 before – left side view...
Trinity House LV – Decking Repairs

Trinity House LV – Decking Repairs

Trinity House Light Vessel Deck Corking Working with Trinity House to Repair Deck corking on the Teak Deck on the Light Vessel The team removed all of the old rubber using manual handling techniques, ensuring all seams were cleaned out.   We then applied Jeffries...
RNLI Walton Pier

RNLI Walton Pier

Decommisson of RNLI Mooring   Working with the RNLI at Walton on the Naze for the decommission of the pier mooring. The team had to use specialist equipment to remove the 4 wave screens weighing 2.5 tonne each. Once this was completed the fuel tank was craned away...
Butler Wharf

Butler Wharf

Butler Wharf Pontoon    Franks Halls and Son Ltd successfully delivered a project  refurbishing the pontoons at Butler Wharf in London  The team used our specialised blasting equipment to remove all the old paint from the steel deck. Following the blasting the...
Harwich Port Gantry

Harwich Port Gantry

Harwich Port Gantry Working with our clients to deliver a brand new Gantry with signs at Harwich Port. The Gantry serves as a safe and efficient means for vehicles. The team fabricated the Gantry out of steel which was then shotblasted and painted with specialised...